Zcamp R5 Prefab Space Capsule Tiny Home Hotel Manufacturers - Zcamp
1.MODEL: ZCAMP R5
2.BUILDING AREA: 30 m²
3.OCCUPANCY LIMIT: 2 people
4.DIMENSIONS(L*W*H): 9.1*3.3*3.4m
5.PATTERN: One bedrooms, living room, bathroom

Details

1


Key attributes

Application

vacation spot

Material

Steel

Product Type

Steel Structure

Design Style

Modern

Warranty

NONE

After-Sale Service

Free spare parts

Place of Origin

Guangdong, China

Brand Name

Zcamp

Model Number

R5

Use

Tiny Home Hotel

Product Name

camping resort prefab house

Material

Aluminum alloy shell/Steel frame

Occupancy limit

2 people

Building area

30 square meters

Exterior Dimensions

9.1*3.3*3.4m

Project Solution Capability 1

Project Solution Capability2

Project Solution Capability 2

3D model design


777

Complete Accessories

1.Supporting Legs

2.Lifting Lug / Fasteners /Package For Transportation

444

Exquisite Interior decoration

1.Integrated Modular Ceiling & Wall

2.Stone Plastic Composite Floor

3.Privacy Glass Door For Bathroom

4.Marble Floor For Bathroom

5.Washstand/ Washbasin/ Bathroom Mirror

6.Bathroom Hook/ Shelf/ Towel Rack

7.Toilet/ Faucet/ Shower/ Floor Drain

8.Whole House Lighting System

9.Whole House Plumbing & Electrical System

10.Blackout Curtains

11.Air Conditioner

12.Whole House Screen Door


666


Pre Fab House Packing and Shipping

1. Transportation stage

The transport truck is required to be a 13.5m long semi-trailer, with a transport width of 3m and a transport height of no more than 4.2m. Flatbed cabinets are required for transportation abroad.


2.  Hoisting stage

After the goods arrive at the site, customers need to contact the local crane service themselves, and our technical team will provide remote guidance. The weight of the entire series of products ranges from 6 to 10 tons. It is recommended to use a crane of no less than 25 tons for loading and unloading.


3.  Installation stage

Before installation, customers need to complete the on-site engineering of water supply, electricity supply, sewage pipelines and load-bearing foundation in accordance with our company's product standard basic hydropower drawings. Under the guidance of our technicians, we accurately positioned it at the designed installation point. After connecting water and electricity, we completed the water and electricity test and submitted it to the customer for acceptance.


555