Zcamp C5 Summer Camping Space Capsule Screen Prefab House
1.MODEL: ZCAMP C5
2.BUILDING AREA: 33.1 m²
3.OCCUPANCY LIMIT: 2 people
4.DIMENSIONS(L*W*H): 9.2*3.6*3.2m
5.PATTERN: One bedrooms, living room, bathroom

Details

1


Camping prefab house with large curved glass skylight

C5 summer camping screen house the exterior and interior are well-designed giving you a more comfortable living experience.With panoramic window and star-gazed skylight,the views are expanded, making you feel like living in the nature.


Key attributes

Application

Scenic spot, Hotel

Material

Steel

Product Type

Prefab house

Design Style

Modern

Warranty

NONE

After-Sale Service

Other

Place of Origin

Guangdong, China

Brand Name

Zcamp

Model Number

C5

Use

Hotel

Product Name

Modern Prefab House

Material

Glass and Aluminum alloy shell

Construction

Double insulation, waterproof and moisture-proof construction

System one

Low voltage and high voltage power system

System two

Solar system

Project Solution Capability

graphic design


1

Complete Accessories

1.Supporting Legs

2.Lifting lug/ Fasteners/Package For Transportation


3


Exquisite Interior decoration, Comfortable Life

1.Integrated Modular Ceiling & Wall

2.Stone Plastic Composite Floor

3.Privacy Glass Door For Bathroom

4.Marble Floor For Bathroom

5.Washstand/ Washbasin/ Bathroom Mirror

6.Bathroom Hook/ Shelf/ Towel Rack

7.Toilet/ Faucet/ Shower/ Floor Drain

8.Whole House Lighting System

9.Whole House Plumbing & Electrical System

10.Blackout Curtains

11.Air Conditioner

12.Whole House Screen Door


4


Packing and shipping

1. Transportation stage

The transport truck is required to be a 13.5m long semi-trailer, with a transport width of 3m and a transport height of no more than 4.2m. Flatbed cabinets are required for transportation abroad.


2.  Hoisting stage

After the goods arrive at the site, customers need to contact the local crane service themselves, and our technical team will provide remote guidance. The weight of the entire series of products ranges from 6 to 10 tons. It is recommended to use a crane of no less than 25 tons for loading and unloading.


3.  Installation stage

Before installation, customers need to complete the on-site engineering of water supply, electricity supply, sewage pipelines and load-bearing foundation in accordance with our company's product standard basic hydropower drawings. Under the guidance of our technicians, we accurately positioned it at the designed installation point. After connecting water and electricity, we completed the water and electricity test and submitted it to the customer for acceptance.


1(3)