Details
Classic series with independent balcony——P5
Zcamp P5 is the most classic series。The width of the 2022 version has been upgraded to 3.3m. The interior design adopts the classic standard king bed, separating wet and dry areas in the bathroom, spacious washbasin, and luxurious balcony.
Key attributes
Application | Hotel |
Material | Sandwich Panel, steel |
Product Type | Steel Structure |
Design Style | Modern |
Warranty | 1 Year |
After-Sale Service | Online technical support |
Place of Origin | Guangdong, China |
Brand Name | Zcamp |
Model Number | P5 |
Exterior Dimensions | 9.5*3.3*3.2 m |
Building area | 31.4㎡ |
Occupancy limit | 2 people |
Advantage | Eco Friendly |
Feature | Fast Build |
Function | Houseboat Camping |
Complete Accessories
1.Galvanized steel frame
2.Fluorocarbon aluminum alloy shell
3.Insulated, waterproof and moisture-proof construction
4.Tempered laminated glass skylight
5.Hollow tempered glass windows
6.Stainless steel side-hinged entry door
7.Panoramic balcony
Exquisite Interior decoration, Comfortable Life
1.Integrated modular ceiling & wall
2.Stone plastic composite floor.
3.Privacy glass door for bathroom
4.Marble floor for bathroom
5.Washstand/washbasin/bathroom mirror
6.Bathroom hook/shelf/towel rack
7.Toilet /faucet /shower /floor drain
8.Whole house lighting system
9.Whole house plumbing &electrical system
10.Blackout curtains
11.Air conditioner
12.Whole house screen door
Packing and shipping
1. Transportation stage
The transport truck is required to be a 13.5m long semi-trailer, with a transport width of 3m and a transport height of no more than 4.2m. Flatbed cabinets are required for transportation abroad.
2. Hoisting stage
After the goods arrive at the site, customers need to contact the local crane service themselves, and our technical team will provide remote guidance. The weight of the entire series of products ranges from 6 to 10 tons. It is recommended to use a crane of no less than 25 tons for loading and unloading.
3. Installation stage
Before installation, customers need to complete the on-site engineering of water supply, electricity supply, sewage pipelines and load-bearing foundation in accordance with our company's product standard basic hydropower drawings. Under the guidance of our technicians, we accurately positioned it at the designed installation point. After connecting water and electricity, we completed the water and electricity test and submitted it to the customer for acceptance.