Details
one-bedroom high end basic style with balcony
Zcamp X7 vessel prefab homes the width of the 2022 version has been upgraded to 3.3m, which makes the interior layout cozier. The floor plan of bedroom/ bathroom/ living room has become a classic design in the high-end camping accommodation industry.
Key attributes
Application | Scenic spot, Hotel |
Material | Steel |
Product Type | Prefab house,Small mobile home |
Design Style | Modern |
Warranty | NONE |
After-Sale Service | Other |
Place of Origin | Guangdong, China |
Brand Name | Zcamp |
Model Number | X7 |
Use | Carport |
Product Name | Prefab house,Small mobile home |
Material | Glass and Aluminum alloy shell |
Style | Morden |
Construction | Double insulation, waterproof and moisture-proof construction |
System one | Low voltage and high voltage power system |
Project Solution Capability | graphic design,3D model design |
Type | X7 |
Complete Accessories
1.Supporting Legs
2.Lifting Lug/Fasteners Package For Transportation
Exquisite Interior decoration
1.Integrated modular ceiling & wall
2.Stone plastic composite floor.
3.Privacy glass door for bathroom
4.Marble floor for bathroom
5.Washstand/washbasin/bathroom mirror
6.Bathroom hook/shelf/towel rack
7.Toilet /faucet /shower /floor drain
8.Whole house lighting system
9.Whole house plumbing &electrical system
10.Blackout curtains
11.Air conditioner
12.Whole house screen door
Vessel Modular Homes Packing and shipping
1. Transportation stage
The transport truck is required to be a 13.5m long semi-trailer, with a transport width of 3m and a transport height of no more than 4.2m. Flatbed cabinets are required for transportation abroad.
2. Hoisting stage
After the goods arrive at the site, customers need to contact the local crane service themselves, and our technical team will provide remote guidance. The weight of the entire series of products ranges from 6 to 10 tons. It is recommended to use a crane of no less than 25 tons for loading and unloading.
3. Installation stage
Before installation, customers need to complete the on-site engineering of water supply, electricity supply, sewage pipelines and load-bearing foundation in accordance with our company's product standard basic hydropower drawings. Under the guidance of our technicians, we accurately positioned it at the designed installation point. After connecting water and electricity, we completed the water and electricity test and submitted it to the customer for acceptance.