Details
Top selling model-Zcamp Z5
Z5 prefab house has been the most popular and best-selling product of Zcamp. The width of the 2022 version has been upgraded to 3.3m. The interior design adopts the classic standard king bed, separating wet and dry areas in the bathroom, spacious washbasin.
Key attributes
Application | Vacation Spot, Campsite, Tourism Development |
Material | Steel |
Product Type | Container Houses |
Design Style | Modern |
Warranty | None |
After-Sale Service | Online Technical Support |
Place of Origin | Guangdong, China |
Brand Name | Zcamp |
Model Number | Z5 |
Use | Hotel |
Product Name | Prefab Capsule House |
Material | Aluminum Alloy Shell/Steel Frame |
Occupancy Limit | 2 People |
Building Area | 31.4㎡ |
Project Solution Capability | Graphic Design |
Complete Accessories
1. Supporting Legs
2. Lifting Lug/Fasteners/Package For Transportation
3. Galvanized steel frame.
4. Fluorocarbon aluminum alloy shell.
5. Insulated, waterproof and moisture-proof construction.
6. Tempered laminated glass skylight.
7. Hollow tempered glass windows.
8. Stainless steel side-hinged entry door.
Exquisite Interior decoration, Comfortable Life
1. Integrated modular ceiling & wall.
2. Privacy glass door for bathroom.
3. Marble floor for bathroom.
4. Washstand/washbasin/bathroom mirror.
5. Toilet/faucet/shower/floor drain.
6. Whole house lighting system.
7. Whole house plumbing & electrical system.
8. Blackout curtains.
9. Air conditioner.
10. Bar Table.
11. Wardrobe.
Packing and shipping
1. Transportation stage
The transport truck is required to be a 13.5m long semi-trailer, with a transport width of 3m and a transport height of no more than 4.2m. Flatbed cabinets are required for transportation abroad.
2. Hoisting stage
After the goods arrive at the site, customers need to contact the local crane service themselves, and our technical team will provide remote guidance. The weight of the entire series of products ranges from 6 to 10 tons. It is recommended to use a crane of no less than 25 tons for loading and unloading.
3. Installation stage
Before installation, customers need to complete the on-site engineering of water supply, electricity supply, sewage pipelines and load-bearing foundation in accordance with our company's product standard basic hydropower drawings. Under the guidance of our technicians, we accurately positioned it at the designed installation point. After connecting water and electricity, we completed the water and electricity test and submitted it to the customer for acceptance.